Skip to main content

These customers have already opted for CAIGOS

Key benefits

Comprehensive data management and integration with specialist applications

Structured data management enables seamless transfer to existing GIS systems and specialist applications.

On-site surveys and photographic documentation

On-site surveys and photographic documentation ensure accurate full-storey counts, including in areas not covered by a development plan.

Independent data maintenance for greater autonomy

Maintaining the data independently after project completion reduces reliance on external service providers.

Comprehensive support for preparing and documenting a legally robust contribution rate calculation

Municipalities may levy contributions on property owners to cover the costs of constructing, acquiring or improving public sewerage and water supply infrastructure.

The rates applied to contributions for the initial provision of network-based public infrastructure are determined using a system-wide contribution rate calculation, known in German as a Globalkalkulation or Globalberechnung. This standardised calculation method is based on the principle of collective cost sharing.

The calculation involves determining the relevant expenditure and allocating the total investment costs incurred across the entire water supply and wastewater service area. This results in an even allocation across all relevant land and floor areas within the area served.

In practical terms, all costs associated with the existing sewerage infrastructure are consolidated and allocated mathematically across the total existing and anticipated land and floor areas.

Together with our partner companies and legal advisers, CAIGOS collects property-specific baseline data, carries out the required calculations and provides legal support throughout the process.

The project work includes collecting the relevant data for all properties that are connected, or can be connected, to the public sewerage system and/or public water supply network. This covers the applicable proportion of each affected property’s land area, the number of full storeys in the main buildings on each property and, depending on the provisions of the local wastewater by-law, the resulting floor area.

How we support you

The task
  • Carrying out a system-wide contribution rate calculation as the basis for determining the contributions payable
  • Ensuring a transparent process that residents can understand, supported by proactive communication
  • Ensuring that the process can be continued independently after project completion, without ongoing reliance on external service providers
Our solution

Specialist legal advice

  • Working with partner legal advisers to prepare a legally robust local wastewater by-law that is practical to administer, with provisions tailored to local requirements, including the assessment basis and depth limitations
  • Legally robust handling of special cases
  • Preparation of a legally robust contribution rate calculation

Digital capture of the required property data

  • Setting up a GIS project with base geospatial data, including ALKIS and digital orthophotos, and importing baseline data in standard GIS formats
  • Delineating settlement areas covered by binding land-use plans from unplanned built-up areas under Section 34 of the German Building Code (BauGB) and from areas outside built-up settlements, based on all legally binding land-use plans available in digital form
  • Reviewing the content of binding land-use plans and other local by-laws as part of statutory land-use planning procedures
  • Combining land parcels into properties based on ownership and identifying all affected properties within the assessment areas
  • Capturing baseline data for all affected properties in accordance with the current local contribution by-law, including the number of full storeys and properties covered by relief provisions, in areas covered by binding land-use plans and unplanned built-up areas under Section 34 BauGB
  • Conducting on-site surveys in unplanned built-up areas to record affected properties, ownership details and key building data
  • Checking whether affected properties are connected, or could be connected, to the public sewerage system or public water supply network
  • Preparing photographic documentation for all buildings in areas not covered by binding land-use plans under Sections 34 and 35 BauGB to record the number of full storeys, and/or analysing oblique aerial imagery

Identifying affected properties

  • Identifying all affected and unaffected properties within built-up areas, as well as affected properties outside built-up settlements

Processing assessable properties

  • Reviewing properties to determine whether special provisions apply, such as depth limitations and rules for rear properties without direct frontage
  • Determining the relevant portions of land for all identified properties

Data management

  • Transferring the data to the GIS in use
  • Providing the basis for the calculation: all properties within the settlement area that are connected to the sewerage system, including the land area measurements relevant to the contribution calculation
  • Providing the collected data in various exchange formats for the subsequent calculation of contribution rates and the contribution payable for each property
The outcome
  • A transparent and easy-to-understand process for residents, covering the collection of baseline data for the system-wide contribution rate calculation and the determination of the applicable contribution rates
  • Reduced workload for the local authority throughout the process
  • Independent ongoing data maintenance after project completion, enabled by a professional handover of the data and project-specific training
Get in touch

Find out more

Your enquiry
Comprehensive contribution rate calculation
Anrede

Your contact person

Saskia Romberg Branch Manager – Ingelheim

Contact

Support